Search

Point 262 Condominiums

Project Name: Point 262 Condominiums

Start Date: 2016

Completion Date: 2018

Stakeholders:

Cambridge Capital Group, LLC,

Andover Real Property Management, Inc., Manager

Louis P. Minicucci, Jr. President

Nauset Construction

City of Cambridge

 

Key Challenges:

Parking Limitations

10% Affordable units while making the project economically feasible

Price for Condos in the area rising rapidly

Site logistics and construction coordination on this dense, urban, zero-lot line site.

 

MINCO Solutions:

20 one-bedroom units average 840 square feet per unit, 35 two-bedroom units average 1,050 square feet per unit

The first floor (at grade) contain bicycle storage spaces, the building lobby, community space and a workout area

One level of below grade parking

Every unit features luxurious amenities, such as dusky glazed yellow birch flooring, LED fixtures including surface mount and LED accent lighting along the soffit, high efficiency HVAC, and balconies or terraces for each unit. Each kitchen includes beautiful Caeserstone quartz counters and AGA/ Marvel appliances.

 

Additional Story Details:

Project Cost: $ 24,000,000

https://patch.com/massachusetts/cambridge/nauset-delivers-point-262-condos-e-cambridge-minco

https://www.high-profile.com/construction-completed-on-point-262/

https://bostonrealestatetimes.com/nauset-delivers-point-262-condominiums-in-east-cambridge-for-minco/

https://www.point262condos.com/point-262-boston-life/

https://nauset.com/project/262-msob-highway/

Project Video Overview: http://262condos.ibidesigns.com/video-tour/