Point 262 Condominiums
Project Name: Point 262 Condominiums
Start Date: 2016
Completion Date: 2018
Stakeholders:
Cambridge Capital Group, LLC,
Andover Real Property Management, Inc., Manager
Louis P. Minicucci, Jr. President
Nauset Construction
City of Cambridge
Key Challenges:
Parking Limitations
10% Affordable units while making the project economically feasible
Price for Condos in the area rising rapidly
Site logistics and construction coordination on this dense, urban, zero-lot line site.
MINCO Solutions:
20 one-bedroom units average 840 square feet per unit, 35 two-bedroom units average 1,050 square feet per unit
The first floor (at grade) contain bicycle storage spaces, the building lobby, community space and a workout area
One level of below grade parking
Every unit features luxurious amenities, such as dusky glazed yellow birch flooring, LED fixtures including surface mount and LED accent lighting along the soffit, high efficiency HVAC, and balconies or terraces for each unit. Each kitchen includes beautiful Caeserstone quartz counters and AGA/ Marvel appliances.
Additional Story Details:
Project Cost: $ 24,000,000
https://patch.com/massachusetts/cambridge/nauset-delivers-point-262-condos-e-cambridge-minco
https://www.high-profile.com/construction-completed-on-point-262/
https://www.point262condos.com/point-262-boston-life/
https://nauset.com/project/262-msob-highway/
Project Video Overview: http://262condos.ibidesigns.com/video-tour/